The execution
- During drilling, PID measurements can be executed for the detection, localisation and qualitative measurement in the drilling process of volatile compounds. Other comparable measurements (such as oil-water reaction, ...) are part of the possibilities.
- Each drilling team has the latest and most accurate equipment for measuring the locations of the drill points, or for positioning predetermined drilling locations.
- The drilling data of a soil drilling is recorded by the drilling team via a handheld computer.
- All drilling equipment is thoroughly cleaned between the various soil drillings and is checked and cleaned with a high-pressure lance every night.
- The drilling teams are mainly deployed for environmental hygienic soil surveys, but can also be deployed for recognition drilling and placing monitoring observation wells around construction works.
- The manual teams are fully equipped with the equipment needed for the execution of well drilling and soil drilling in various soil types. In addition to the classic drills (Edelman, Clay, Grind, ...), they also always have the equipment to place ground bores through pulses with work water (borehole tubes and pulse) and to eventually pierce any hard surfaces (core drill) and rubble (ramguts).